![]() The biggest benefit is that, once built on screen, any project will be built on site without any surprise, missing information, uncoordinated information. Using a specific platform (BIM plus) we are now experimenting the use of the model directly on site to check on details, materials, etc.Īfter 20 years I can certainly say that I'm working BIM completely with all the 5 dimension (3+ Cost + Time) which is a great achievement. The accuracy of our cost estimate is exceptionally good. ![]() More recently, with a friend and colleague, I've developed a system to synchronise the model with third party pricing books: we obtain estimate of cost in a matter of minutes. ![]() With Construction Modelling I solve 95% of problems occurring on site in 5% of the time. In the last 6 years I started developing construction models (initially in architectural firm, later in a construction company). Since the very beginning (20 years ago) I've experienced at least 50% of time savings for standard architectural drawings. Just the idea of working in a 2D or 3D non-parametric environment is simply madness in my view. I never worked with traditional CAD in my professional career.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |